Before you start repair work, you need to make a schedule. It usually starts with the floors. Therefore, you need to calculate the time it takes for this part of the room. If you prefer self-leveling mixtures, then some factors should be considered. Among others, it is worth highlighting those that affect the drying of materials. Among others:
- number and final layer thickness;
- type of finish;
- type of dry composition;
- additives used;
- humidity and temperature in the room.
Which topcoat to use
As for the finish coating, then it can be:
To accelerate the polymerization of bulk floors and their further operation, some rules should be taken into account. Firstly, the composition should be evenly distributed over the surface. Although the material is called self-leveling, it should be helped. In order for the solution level to be the same, use a long and short spatula.
What is important to consider
To remove air bubbles from the mixture, use a needle roller. Secondly, the optimum temperature in the room should be in the range from 22 to 25 ยฐ C. The jumps are unacceptable, otherwise the solidification will drag on for more than 2 weeks.
Conditions for normal drying of the floor
If you wondered how much the bulk floor dries under the laminate, then this information can be found below in the article. However, in order to be sure that it will take exactly the time specified in the instructions to dry, you must follow simple rules. For example, the humidity level in the room should be kept at a level of 60 to 65%.
How to avoid mistakes
In addition, the surface should be protected from ultraviolet radiation. 1 hour after completion of work, cover the floor with a thick film. After 6 hours, varnish can be applied to the floor. After 12 hours or more, foot traffic is allowed. When the week has passed, the base can be subjected to high load. If you comply with these requirements, the floor will dry in accordance with the deadlines.
Drying time
If you, like many home masters, are interested in the question of how much the bulk floor dries under the laminate, then you should understand the basis of the coating. The polymerization period will depend on this. For example, quick-drying solutions have good technical properties and short drying times. This usually takes from 2 to 5 hours. But as for coatings based on cement, they are usually used in private construction. They contain additives, plasticizers and cement. This floor can harden for 1 to 2 weeks.
You may also be interested in how much the bulk floor dries under the laminate. If the material is polymeric, then it is usually used in industrial construction. The drying time in this case is from 2 to 6 days. The final value is affected by the number of layers and their thickness, as well as the presence of additives and special pigments. You can use a polyurethane compound. It is durable and durable. On this floor it will be possible to move a person in 10 hours at least. Full solidification should be expected on the third day.
If, having visited a building materials store, you wondered how much the bulk floor under the laminate dries, then you should know that gypsum mixtures, which are also called anhydride ones, are not recommended for use in rooms with high humidity. These include bathrooms and bathrooms. This is because such a material does not have the quality of moisture resistance. You can walk on the plaster floor in two days, and install furniture in 10.
If you want to choose a floor with high durability, you should prefer an epoxy composition. The polymerization time will depend on the number of layers and the final coating thickness. On average, polymerization takes from 2 to 5 days. Quite often, shoppers in a store wonder how much the bulk floor should dry. If you have a coating with a 3D effect, then the hardening period will depend on the image parameters.
If a film or vinyl paper is used for the decor, then the finish coating can be applied immediately. When the paint is applied, the drying time may increase. Of great importance is the drying time of the glossy layer and the period of hardening of the finish coating. The drying time of the 3-D floor is about 7 days. You can reduce the time by using a quick-drying composition.
Drying time versus finish
Self-leveling floors are intended for laying under a laminate, linoleum or tile. The polymerization period also depends on the type of finishing material. If you plan to lay linoleum, then it is better to use a polyurethane compound, because it can be used already 3 days after pouring. You may also be interested in how long the bulk floor dries if it is laid under the laminate. For this, it is better to use gypsum, polymer or polyurethane compounds.
Under the tile, cement mixtures are usually used. Full cure can be expected within two weeks. The drying period depends on the quality of mixing the mixture and its uniform distribution. With a different outcome, some areas may dry faster, while others will take another 12 hours. Before filling the floor, you should pay attention to the characteristics of the room. This should include:
- foundation quality;
- humidity;
- temperature.
These factors affect the drying time of the floors. The choice of mixture should depend on the type of finish. This should be considered when choosing bulk floors.
Manufacturers Overview
Before you make a choice in the direction of a particular bulk floor, you should pay attention to how much the bulk floor under the tile dries . An excellent example is the products of several manufacturers. For example, Vetonit 3000, which can be stacked up to 5 mm thick, can be used for walking after just 3 hours. You can apply the coating every other day at least. โFounders Mastline T-48,โ which can have a thickness of 3 to 80 mm, is used for further laying of tiles or laminate. In the first case, work on the application of the finish coating can be done in 3 days, in the second - in 7 days. Walking on such a coating will be possible after 4 hours.

Quite often, buyers ask sellers how much the Eunice bulk floor dries. If you have before it a variety of "Eco", which is based on gypsum, then you can lay tiles on such a surface in five days, and a laminate or parquet - in 7 days. Material is poured with a thickness of 10 to 100 mm. And it will be possible to walk on such a coating within 4 hours after completion of work.
How long does the bulk floor of the Prospectors dry? This question may also interest you, because these products are quite popular among consumers. If you have a thin bulk floor in front of you, then you can lay the decorative coating in a couple of weeks, and walk in 8 hours. The thickness of the final layer of the rough surface can be from 1 to 20 mm.
When choosing a mixture, you must distinguish between two concepts - the period of curing and drying time. The second implies the possibility of foot loads, while the first - intensive continuous operation. Manufacturers make it clear to customers when it is possible to walk on the floor in a finished screed, and when to start finishing coat. In this regard, you may be interested in how much the bulk floor dries under linoleum. If you have the versatile Ivsil Tie-Rod-I mixture, then the drying time for laying the said coating is 14 days. The same amount will be used to dry out the universal composition of Weber Vetonit 4100.
Fill Technology and Reviews
In the process of pouring a self-leveling mixture, it will be necessary to form an underlying layer. According to consumers, this can reduce the consumption of pouring in half. If you use a polymer floor, then its thickness should not exceed 5 mm. After the layer is poured onto the surface, air bubbles must be removed from its thickness. It is most convenient to use a needle roller, as emphasized by home craftsmen, for this. Then you can start applying the front layer. You can distribute the composition at this stage using a squeegee.