Repair in the room: sequence, recommendations of builders, useful tips

When planning repair work, one has to deal with many questions and difficulties associated with the preparation and implementation of this process. For an excellent result, a person requires maximum effort, accuracy, care and a clear plan of action. All this needs to be thought over well at the initial stage of work.

floor wall repair sequence

Preparation of the room for easy (cosmetic) repair

The first step is to prepare the surface for coating. First you should remove the old wallpaper. To do this, moisten them. If paint has been applied, then it must be removed, preferably with a spatula. To create a perfectly flat surface should be puttied and primed it. To apply the paint, you must achieve perfect evenness. To do this, you have to putty and polish several times. This can be done with sandpaper and a sponge.

When decorating with drywall and other materials, such painstaking alignment is not required. It is enough here that the surfaces converge at right angles.

It is necessary to remove the frames and skirting boards, sanding the window sill, canvases of windows and doors with sandpaper. If necessary, then putty and primer.

Surface Repair Tips

Work must be done according to the sketch plan. Walls and ceilings are painted with acrylic and water-based paints with various rollers. When working with decorative plasters, special fluids are used. On the first try, not everyone can do it. You need to work out well.

repair in the room where to start the sequence

The basic rule in wallpapering is that you should start work from the corner. It is important that the pattern matches the pattern. The product needs to be cut larger than the measured size, because the height of the wall can be different. In this case, you can safely fantasize: to work with stencils, stickers, collages and a variety of textures.

If the decoration is done with panels, calculations and measurements must be done before work and draw a diagram. It is necessary to use special adhesives specified in the instructions.

sequence of repairs in the room floor wall ceiling

When applying wallpaper to leave the ceiling without a baguette is the highest skill, since not everyone knows how to do it perfectly perfectly. For greater accuracy, it is necessary to close the joints.

Easy repairs do not completely update the floor. In this case, you can limit yourself to cleaning and varnishing parquet surfaces. Skirting board is easy to update. If desired, paint can be applied to windows, doors and window sills. Doors are updated by various ornaments and taping. Also, the batteries should be masked with beautiful grilles. Having done such a little work, you can achieve a good update of the old interior.

Room repair sequence

Before starting work, you need to carefully prepare everything, make calculations and draw up a diagram of the updated room. This is best recorded on paper. It will be easier and faster to carry out work. And of course, you need to strictly adhere to the sequence of repairs in the room. Also, before you start, you should think carefully about what work you can do yourself and what you need to trust the builders. After all, the amount of upcoming costs depends on this. What sequence of repairs in the room must be followed:

  • It is necessary to specifically decide what kind of work remains to be done (change windows, doors, tiles, etc.).
  • A mandatory point is the distribution of finances when planning the sequence of repairs in the room. At this stage, it is necessary to carry out all calculations and measurements relating to the objects of reconstruction (walls, floors, ceilings, etc.).
  • Then, the purchase of raw materials and the preparation of the necessary equipment is carried out.
bathroom repair

Builders recommend buying materials a little more than the required amount so that you do not have to spend time on a trip to the store.

Repair in the room: where to start? Sequence

Before starting repairs, you need to free the room from unnecessary things that will interfere with work (remove all furniture, remove the chandelier and other items). Pre-vacuum the room. Experts advise starting work with windows and doors. To avoid harm to installed products (window, door) during the repair process, first put the frames, and then all other parts. Next, you need to begin to disassemble the old parts (remove the wallpaper, remove the plaster, coatings from the floor, etc.). And throw it all away so that it does not interfere with the work. It is necessary to adhere to the sequence of repairs in the room: ceiling, walls, floor. It is in this order that the work needs to be done. And only at the very end they install chandeliers, plinths, furniture and other items.

wall repair sequence in a room

Useful Tips

  • For good, high-quality work, it is necessary to carefully clean and level the surfaces before installing new materials.
  • According to the recommendations of specialists, before laying the coating on the floor, you need to install a cement screed to level the floor.
  • The most suitable for the ceiling is the installation of a tensile structure. She will look very beautiful and will last a long time. In addition, this design has built-in lighting, and there is no need for a chandelier.
  • Now the leader among the windows are plastic products. They have good sound insulation, durability and a long service life.
room repair sequence

The nuances of arranging the bathroom

As in other rooms, you must adhere to the sequence of repairs in the bathroom. Only here it is necessary to change the pipes and plumbing, and then proceed to the steps described above. The bathroom is the most time-consuming in terms of repair. The difficulty lies in working with plumbing, electricity, installing tile and ceramic plates, as well as preliminary leveling the surface.

Recommendations builders to repair the bathroom

Experts give several recommendations:

  • Dismantling works. Usually this process is performed in the premises of the old model. The size of the bathroom is increasing due to the analysis of the plumbing element.
  • Water supply and sewerage. You can’t spare funds and efforts in installing these communications, otherwise there will be problems, and you will have to constantly change them due to leakage.
  • Work with the ceiling. It can be done in two ways. You can make a plasterboard ceiling, and you get a perfectly flat surface (standard option) where you can install lighting. Tension structures are also used. This is a more reliable way. This type of ceiling is resistant to pressure in the event of floods from the neighbors.
  • Conducting electricity. If this is a room with high humidity, during electrical installation procedures you need to be extremely careful and careful. It is strictly forbidden to install sockets and switches inside the bathroom.
  • Products and equipment plumbing. There are various types of plumbing elements on the market. You can choose plumbing utensils for every taste and color (sinks, bathtubs, boilers, hoods, toilets, showers, bidets, etc.).
  • Tiled surface. The final step in the repair of the bathroom is the installation of tiles. There are many types of this material on the market, everyone can choose at their discretion, finances and preferences.

Modern wall and floor coverings

In whatever sequence the walls are repaired in the room, first you need to make a list of the necessary materials. It can be various wallpapers, slat materials, wooden lining, paints and varnishes, decorative plaster, PVC panels and much more.

what is the sequence of repairs in the room

According to the plan, in the process of reconstruction, work is first going on with the ceiling. Always follow the sequence of repairs in the room. Walls and floors are finished after the ceiling. When installing flooring, you can use various modern materials instead of monotonous, bored linoleums. There are many types of flooring materials: MDF-based laminate, cork (high natural material), moisture-resistant elastic laminate, 3D self-leveling floors, various types of carpets and much more.

Thus, if you strictly adhere to the repair sequence in the room, this process will be significantly accelerated and will please a good result.